LASSO DRILLING LLC''S POST VIDEO

New video engineering vehicle drilling rig

New video engineering vehicle drilling rig

Combining Nabors proprietary Smart Suite of automated drilling software with Canrig® robotics on the PACE®-R801 creates an unmanned rig floor that removes crews from red zone areas and delivers consistent, predictable drilling performance. Video from the first well is available here, PACE®-R801. [pdf]

Drilling video of a small down-the-hole drill

Drilling video of a small down-the-hole drill

A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or ). The DTH hammer is one of the fastest ways to drill hard rock. The system is thought to have been invented independently by Stenuic. [pdf]

FAQS about Drilling video of a small down-the-hole drill

What is a down-the-hole drill?

A down-the-hole drill, usually called DTH by most professionals, is basically a jackhammer screwed on the bottom of a drill string. The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or drilling mud). The DTH hammer is one of the fastest ways to drill hard rock.

What is down-the-hole (DTH) drilling?

Down-the-hole (DTH) drilling has made it easier for contractors to drill wells faster and more efficiently, and to transition from dirt boring to rock boring just by adding a compressor and hammer to the drill bit.

What is a DTH drill rig?

A down-the-hole drill, usually called DTH Drilling Rig, is basically a mini jackhammer screwed on the bottom of a drill string. The speedy hammer activity breaks hard stone into little flakes and dust and can be dismissed evident by the air exhaust in the DTH hammer.

How long did it take to drill a 12,000 ft hole?

The original estimate for completion of a 12,000-foot hole was 30 days using the conventional rotary technique, which was reduced to 13 days using the DTH method. Before DTH was used, drillers would typically case the vertical portion of the well and convert to rotary drilling to drill at a tangent.

How was a hole drilled?

This system could not guarantee a finished hole size and only pure vertical holes could be drilled as the system basically relied on gravity. Debris from the hole was baled out using a baling tube with a clack valve, which was periodically dropped on a winch to capture the slurry, which was then brought to the top of the hole to be discharged.

How does a drill work?

This action along with the rotational movement of the drill string crushes the rock efficiently. Since the piston strikes directly on the bit, energy transfer takes place down the hole with minimum loss of energy, allowing drilling to greater depths. The driving medium i.e. compressed air is also the flushing medium.

Different parts of a drilling rig

Different parts of a drilling rig

Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). . • (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams. [pdf]