Designed long-reach horizontal pad drilling applications for either shale gas or tight oil, walking rigs cut drilling costs by spending much more time making hole and much less moving (rig up and tear down), picking up and laying down drill strings and tools, and mixing different batches of drilling mud and cleaning mud tanks for drilling various wellbore sections.
[pdf] Continuous full-load operation (load rate>90%) accelerates component wear and may shorten life to 6-8 years. Reasonably control the load rate (recommended 70%-85%), and avoid frequent starts and stops through frequency conversion control or air tank adjustment.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]