Accumulators are ASME-coded pressure vessels for the storage of high-pressure fluid. These accumulators as a part of the BOP control unitare available in a variety of sizes, types, capacities, and pressure ratings. The two (2) basic types are bladder and float which are available in cylindrical or ball styles. The. .
Accumulator bottles are containers that store hydraulic fluid under pressure for use in effecting blowout preventer closure. Through the use of compressed nitrogen gas, these. .
As a minimum requirement, all blowout preventer control units should be equipped with accumulator bottles with sufficient volumetric capacity to provide the usable fluid volume (with. .
The closing system should be capable of closing each ram preventer within 30 seconds. Closing time should not exceed 30 seconds for.
[pdf] This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf] 
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing).
[pdf]