Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. Tong safety lines should be of sufficient length, preferably allowing a 90° breakout angle between the. .
Ensure that the crew is up to strength and that individuals know the tasks to be carried out. A communication system should be operational between. .
Considerable preparation is required before the trip is commenced. The following are among the most essential actions that should be carried out. .
Having completed the preparations outlined in the previous section, the trip out of the hole can be started. The following procedure is proposed as a guideline: 1. Flow checkthe well with the pumps off to ensure that the well is static. 1. Pump a slug. This enables the pipe to be pulled dry and the hole to be accurately monitored during a trip. 2. .
[pdf] Rotary screw air compressors work by trapping air between two meshed rotors and reducing the volume of that trapped air as it moves down through the rotors. This decrease in volume results in compressed a.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]