This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf] Mars field was discovered in 1989 at around 130 miles south of New Orleans. The field, located at 3,000ft water deep, started production in 1996. Mars B was discovered after Shell geologists located untappe.
[pdf]