
DTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling applications, its name originated from the fact that the percussion mechanism followed the bit down into the hole. Applications were later found for the DTH method. .
A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a. .
A is first thought to have been used for rock drilling in 1844. Many quarries used hand held tools that required the driller to suspend himself from a rope over the. .
In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the fluid (air, water or drilling mud) used to. .
DTH products can be used in the following applications:• Mining- drill and blast holes in open pit mining, where the drill operator will drill several holes, then. In down-the-hole drilling a drill rod is fitted with a hammer at its lower end. The hammer, which is mounted on the drill bit, is activated through the addition of compressed air and driven into the ground – simultaneously rotating and impacting.
[pdf] A rotary drilling rig works by rotating a drill string, which applies downward pressure to a drill bit that grinds the earth. Drilling fluid or air is pumped down the drill string to cool the bit, carry cuttings to the surface, and stabilize the borehole.
[pdf] In a drilling rig, the drill line is a multi-thread, twisted wire rope that is threaded or reeved through in typically 6 to 12 parts between the traveling block and crown block to facilitate the lowering and lifting of the drill string into and out of the wellbore.
[pdf]