
This is the tank from which drilling fluid is pumped downhole and to which drilling fluid returns from the hole is received. The route taken by the drilling fluid when circulating is called the active (circulating) system. At the start of circulation, the Mud Pumps are lined up on the Active Tank, and drilling fluid is pumped to. .
These are used for storing fluids according to requirements. Reserve mud is usually prepared or stored in these tanks or different fluids in preparation for. .
The Sand Traps are usually positioned below the shale shakers and act as settling pits for the drilling fluid after passing through the shale shakers. The. .
These tanks are more minor than active and reserve tanks. They are used for preparing “slugs” (high-density mud that is pumped into the drill string before tripping out of the hole) and pills to address particular situations (e.g. an LCM pill to control formation losses, a unique mix to improve drilling mud properties, etc.). .
The Trip Tank is a tall, narrow tank located near the flow line and used for accurately monitoring drill pipe displacement volumes while tripping pipe in or out of the hole. Active drilling mud from the Trip Tank is circulated across the hole, and valves in the flow line near the Bell Nipple are realigned to send the fluid returns back to the Trip .
[pdf] As a kind of friction clutch that uses compressed air as manipulating power source, pneumatic-tyred clutch is widely used in such equipment as oil drilling rig and workover rig, and is also an important part of the drive systems of oil drilling rig and workover rig.
[pdf] Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The numbe.
[pdf]