The Boyles C5/C5C surface core drilling rig is compact, yet powerful. Its compact design makes it easy to position and transport, even by helicopter. During helicopter transport, the rig is broken dow.
[pdf] The analysis of the cause of the failure and the solution are as follows: (1) Whether the condensed water discharged from the trap has a large oil content, if so, check the leakage point in the unit and eliminate it, check whether the oil level of the compressor is too high, if so, reduce the oil level; (2 ) Whether the opening pressure of the minimum pressure valve is normal, if so, troubleshoot, and it is necessary to replace the valve; check whether the oil return pipe is blocked, if so, clean or replace the oil return pipe: (3) Replace the oil separator core.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]