Deepwater Horizon was an ultra-deepwater, dynamically positioned, semi-submersible offshore drilling rig owned by Transocean and operated by the BP company. On 20 April 2010, while drilling in the Gulf of Mexico at the Macondo Prospect, a blowout caused an explosion on the rig that killed 11 crewmen and ignited a fireball visible from 40 miles (64 km) away. The fire was inextinguisha. DesignDeepwater Horizon was a fifth-generation, RBS-8D design (i.e. model type), deepwater, ,. .
Deepwater Horizon was built for R&B Falcon (which later became part of ) by in , South Korea. Construction started in December 1998, the was laid on 21 March 200. .
At 7:45 p.m. on 20 April 2010, during the final phases of drilling the exploratory well off the gulf of Mexico, a geyser of seawater erupted from the onto the rig, shooting 70 metres (230 ft) into the air. This wa. .
Transocean received an early partial insurance settlement for total loss of the Deepwater Horizon of US$401 million about 5 May 2010. noted that the insurance recovery was likely to be more than t.
[pdf] A drilling rig is an integrated system that , such as oil or water wells, or holes for and other construction purposes, into the earth's subsurface. Drilling rigs can be massive structures housing equipment used to drill , , or natural gas extraction wells, or they can be small enough to be moved manually by one person and such are called . Drilling rigs can s.
[pdf] 
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams.
[pdf]