FHWA TECHNICAL MANUAL FOR DESIGN AND CONSTRUCTION OF

Technical Standard Specification for Rock Drill Maintenance

Technical Standard Specification for Rock Drill Maintenance

API RP 7G-2, also known as the “Recommended Practice for Inspection and Classification of Used Drill Stem Elements,” is a crucial document in the drilling industry. It meticulously outlines the required inspection levels, detailed procedures, and testing methods for used drill stem components. [pdf]

Large screw air compressor technical parameters

Large screw air compressor technical parameters

Nominal Pressure: 8 to 13 bar g Motor Power: 55 - 75 kW Volume Flow: 1.65 to 13.57 m 3 /min Variable speed compressors can efficiently and reliably handle the varying air demand found in most plant air systems. These compressors speed upand slow down to match air supply to air demand as it fluctuates. [pdf]

Jack up drilling rig design

Jack up drilling rig design

Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site with the hull lowered to the water level, and the legs extended above the hull. The hull is actually a water-tight barge that floats on the water's surface. When the rig reaches the work site, the crew jacks the legs downward through the water and int. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.