FRANKS 300 WORKOVER RIG SPECS

Workover rig drawworks connect drill line

Workover rig drawworks connect drill line

The drawworks reels in and reels out the drilling line. The drilling line is connected to the traveling block and hook which connect to the drill string. The drill string runs over the crown block and setup like a block and tackle pulley system. [pdf]

Workover drilling rig

Workover drilling rig

Before any workover, the well must first be . Since workovers are long planned in advance, there would be much time to plan the and so the reverse circulation would be common. The intense nature of this operation often requires no less than the capabilities of a . The workover begins by killing the well then removing the wellhead and possibly the flow line, then installing a B.O.P. commonly known as a , then lifting the fr. [pdf]

Pantera dp1500i drill rig specs

Pantera dp1500i drill rig specs

xtractor RD1635CF and CSL System. Replaces standard components HF1560T Rock Drill (If hole dia 5,5" and hard rock = consult factory) Anti- freeze system for air lines Biogradeable hydraulic oil, not with CSL Central lubrication system Sandvik Electric fuel filling pump Electric hydraulic oil filling pump Electric water filling pump Fast fill connection for engine coolant, hydraulic and engine oils Fast fill connection for fuel and water tanks (not with option 5110) Fire suppression, Eclipse Sustain, automatic 0°C to +60°C Fire suppression, Eclipse Extreme, automatic 0°C to -40°C Guides for grousers Hydraulic rear ground support Hydraulic winch with radio remote and cable tightness automatics Hydraulic winch with full radio drilling, tramming boom and rod handling Remote Screen interface (Tab [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.