The and the topsides of the Perdido were constructed separately and then assembled in its final position in the Gulf of Mexico. The Perdido's hull or spar was constructed by in . A barge shipped the 22,000 tonne spar 13,200 kilometres (8,200 miles) from the to the Gulf of Mexico. After floating the spar, it was towed to its final home above the Alaminos canyon 320 kilometres (120 miles) fr.
[pdf] A drilling rig is an integrated system that , such as oil or water wells, or holes for and other construction purposes, into the earth's subsurface. Drilling rigs can be massive structures housing equipment used to drill , , or natural gas extraction wells, or they can be small enough to be moved manually by one person and such are called . Drilling rigs can s.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]