Deepwater Horizon was a fifth-generation, RBS-8D design (i.e. model type), deepwater, , column-stabilized, semi-submersible , designed to drill wells for oil explorati. .
Deepwater Horizon was built for R&B Falcon (which later became part of ) by in , South Korea. Construction started in December 1998, the was laid on 21 March 200. .
At 7:45 p.m. on 20 April 2010, during the final phases of drilling the exploratory well off the gulf of Mexico, a geyser of seawater erupted from the onto the rig, shooting 70 metres (230 ft) into the air. This wa. .
Transocean received an early partial insurance settlement for total loss of the Deepwater Horizon of US$401 million about 5 May 2010. noted that the insurance recovery was likely to be more than t.
[pdf] Electric generators powered by large diesel engines (the prime movers) generate electricity that move the heavy rig equipment such as the rotary table (or top drive), mud pumps and drawworks. Electric drill rigs are more expensive than mechanical rigs, but offer some nice advantages in return.
[pdf] 
Holes could be drilled to increasing depths without the loss of performance since the energy source was always directly behind the drill bit. The system was able to drill in almost all rock conditions that other systems were unable to do. .
A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a. .
A is first thought to have been used for rock drilling in 1844. Many quarries used hand held tools that required the driller to suspend himself from a rope over the. .
DTH products can be used in the following applications:• Mining- drill and blast holes in open pit mining, where the drill operator will drill several holes, then. .
DTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling. .
In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the fluid (air, water or drilling mud) used to.
[pdf]