To decide on a site with a potential oil/gas payout, Geologists and Geo-Scientists work their ways in and around the information collected off the areas with possible oil or gas reservoirs. Survey vessels with or without Dynamic Positioning systemsare hired for seismic surveys. These maritime vessels are equipped. .
Once the site is identified and selected, boundaries are surveyed and earmarked by the local governing body for Energy and Resources. Studies for impact on the environment are carried out. After determining the potential energy sites, oil companies are then. .
After the potential energy-rich blocks are legally cleared, oil companies pursue their investments by employing mobile drilling units that are temporarily acquired and are able to move on to. .
These self-contained drilling structures are as good as the drilling barges only to the exception that these massive structures are positioned onto. .
They are mostly utilized for shallow water drilling in calm water conditions. Drilling equipment is placed on to the barges’ decks and towed to.
[pdf] There are two separate but closely related parts of preparing for a drilling project—planning the well and designing the well. “Planning” means to list, define, schedule, and budget for all the multitud.
[pdf] 
In the oil and gas industry, depth in a well is the distance along a well between a point of interest and a reference point or surface. It is the most common method of reference for locations in the well, and therefore, in oil industry speech, "depth" also refers to the location itself. Strictly, depth is a vertical coordinate. .
Although it is an intuitive concept, depth in a well is the source of much confusion because it is frequently not specified correctly. Absolute depth should always be specified with three components:• a. .
Specification of an absolute depth: in Figure 1 above, point P1 might be at 3207 mMDRT and 2370 mTVDMSL, while point P2 might be at 2530 mMDRT and 2502 mTVDLAT.. .
• • • Log Data Acquisition and Quality Control, Ph. Theys, 1991, Editions Technip .
• Well depth values taken during the drilling operation are referred to as "". The "total depth" for the well, core depths and. .
• Unit: the usual unit of depth is the metre (m).• Path: common expressions of path are measured depth (MD) – elsewhere often known as along hole depth (AHD) – and true vertical depth (TVD). Note that using TV for true vertical.
[pdf]