Use rock drill oil for the 38 lb and 60 lb class tools. Check all nuts and bolts to ensure they are tight on the tool. Make sure retainer locks into place. Replace retainer and springs if worn. Rotate the chuck bushings to ensure that pawls are engaging.
[pdf] Either an electrical problem, or the compressor has tripped on a safety device. Check supply power. Check for errors on display. Check emergency stop is out. Check and reset the overload relay. If it’s a new installation, check the phase sequence. Ambient temperature too high or not enough ventilation.
[pdf] Each screw machine must be equipped with a gas storage tank and, if needed, auxiliary equipment such as a cold dryer and a filter. The installation requirements are as follows: A) The installation sequence of supporting equipment is: “air compressor → gas tank → gas-water separator → cold dryer.”
[pdf]